South Twin Treated with Fluridone on 06/09th/2019 …
Schmidt’s Aquatic completed the initial treatment of Fluridone on S Twin today, 06/09th/2019. Water monitoring will begin in 2 weeks. We will continue to do periodic temperature samples of the water as during summer the water stratification pushes deeper and thus future bump treatments will need to be computed over a larger water volume.
First bump treatment on S Twin on Monday, July 22, 2019 …
We will be performing the first bump treatment on S Twin on Monday, July 22, 2019. The posted sign guidelines still apply and you can find DNR fact sheet on Fluridone in a link on our website.
The EWM treatment is a very slow process and as such you will have active EWM growing yet this summer. We ask that you refrain from active boating this summer on S Twin in the areas of significant EWM typically between 4′ – 14′ please. This will reduce the fragmentation of EWM and its ability to float and seed elsewhere. Whenever possible we ask that you boat in the > 14′ as this will be a factor in the success in our $140,000 treatment on S Twin this summer.
On 06/17th/2019 Clean Lakes completed a 14.3 acre treatment area along the Lakota Boat Ramp Corridor on N Twin utilizing the herbicide treatment product ProcellaCOR.
Aquatic Plant Management will be performing “Diver Assisted Suction Harvesting” (DASH) on N Twin during the following dates …
- Wednesday, 06/26th/2019
- Thursday, 06/27th/2019
- Friday, 06/28th/2019
- Monday, 07/08th/2019
- Tuesday, 07/09th/2019
- Wednesday, 07/10th/2019
- Thursday, 07/11th/2019
- Friday, 07/12th/2019
South Twin Fluridone Treatment 06/09th/2019 …



North Twin ProcellaCOR Treatment 06/17th/2019 …



Aquatic Plant Management DASH Harvesting 07/08/2019 …

Another Successful North & South Twin Lake District Volunteer EWM Run to the Conover Compost Site …